zondag 18 april 2010

Preparing for the next level

Lubbeek, Sunday, April 18, 19°C

Hi all,

As you can see on the next picture, we added some concrete on top of the concrete flooring. Besides that we started by preparing the first layer of "white" blocks. As much as possible the insulation needs to be perfect, and so, there may be no contact between the inner concete parts and the outer wall.
Tomorrow there will be a delivery of new blocks, and thus we can carry on with the next level.
As for our safety and also as requested by the safety coordinator, we added some side-protection. Simple, but efficient enough.
Have a nice working week!

Zoals u kunt zien op de volgende foto, voegden we beton gestort bovenop de welfsels. Daarnaast zijn we gestart met de voorbereiding van de eerste laag van "witte" blokken. De isolatie moet zoveel mogelijk perfect zijn, en dus kan er dan geen contact zijn tussen de beton van binnenkant en de buitenmuur.
Morgen zal er een nieuwe levering van blokken komen zodat we kunnen doorgaan met het volgende niveau.
Zowel voor onze veiligheid en ook zoals gevraagd door de veiligheidscoördinator, hebben we wat rand-beveiliging geplaatst. Eenvoudig, maar efficiënt.
Nog een fijne werkweek!

2 opmerkingen: